Skip to content
A SKATEL splicer working from the open back of a service van at dusk, beside a cell tower compound.

Telecom infrastructure contractor based in Acheson, Alberta. Splice, place, drill, locate and civil — under one contract.

FIBRE, COPPER AND CIVIL CREWS

ZERO

Reportable incidents

Five consecutive years, across drilling, confined-space entry and aerial work.

2,883

Splice locations

Fibre and copper, completed since 2019 across MXU, residential and commercial builds.

WHAT SKATELTAKES ON

One contractor for splice, place, drill, locate and civil. The trades that normally hand a build to each other work off the same schedule here.

A fibre build stalls in the gaps between contractors — the drill crew finishes and the splicers are two weeks out, or the locate ticket lands after the trench is open. SKATEL runs all six disciplines out of Acheson with its own crews, so the sequence is a scheduling decision rather than a negotiation. Larger drilling scopes are the one exception, supported by established partner contractors across Alberta and British Columbia.

Two technicians roping duct from an open vault at the roadside.

260,620m

Rod and rope

Duct proved and roped for mainline and drop builds by a six-member confined-space certified crew.

An aerial lift crew lashing cable to a utility pole.

236,800m

Cable placed

Fibre, copper, coaxial and CAT5 — aerial, buried and in-duct, including aerial lashing.

A locate technician sweeping a boulevard with a locator wand.

192,000

Locate tickets

Cleared across Edmonton and surrounding areas by five dedicated locate technicians.

A directional drill rig set up on a rural right-of-way.

44,600m

Directional drilling

Horizontal directional drilling since 2021 on two Vermeer 6x6 units and one 10x15.

A civil crew setting a concrete vault beside an excavator.

29,257

BDO collections

Building distribution occupancy agreements collected for Telecon and CTI, at an 85–90% signing rate.

0105

BUILT FOR THE FIELD

Certified crews, current equipment, and a document package that closes the job. A dedicated QC specialist reviews every completion document before it reaches the client.

CONFINED SPACE

Every rod-and-rope technician is confined-space certified and carries full field support equipment.

TESTED, NOT ASSUMED

Two OTDR units, OPM and OLT meters. Every splice location is traced and recorded before handover.

A SKATEL technician splicing fibre at the back of a van on a residential street at dusk.

No job is so important and no service so urgent that we cannot take time to perform our work safely.

SKATEL safety policy

TEN SERVICELINES

Every discipline a fibre build needs, under one contract. Take one line or the whole scope — the crews are the same either way.

  • A splicer working a fibre tray inside a splicing van.

    Fibre & copper splicing

    • 4 splicing trucks, 4 splicers
    • 5 ribbon fusion splicers
    • 2 OTDR units, OPM and OLT meters

HOW A SCOPEMOVES

From estimate to close-out, with the document package built as the work happens. You get one point of contact who stays with the project until it is signed off.

A locate technician marking a boulevard at dusk.

01

SCOPE & ESTIMATE

We walk the print with you, confirm the territory and the disciplines involved, and price against real crew availability rather than a nominal rate. Budgetary numbers for planning, firm numbers once the design is issued.

A locate wand and transmitter set up on a residential boulevard.

02

LOCATE & PERMIT

Our own locate technicians clear the tickets — the same team that cleared 192,000 of them since 2019 — so the crew arriving to open ground is not waiting on a third party's schedule.

A drill rig and support crew working a rural right-of-way.

03

DRILL, PLACE & CIVIL

Directional drilling, rod and rope, cable placement and the vault and pedestal work run as one sequence under one supervisor. Hydrovac daylighting and restoration are coordinated with the drilling crew, not subcontracted after the fact.

Coloured fibre laid out in a splice tray under work light.

04

SPLICE & TEST

Four splicing trucks, five ribbon fusion splicers, two OTDR units. Every location is traced, the power budget measured, and the results recorded against the location ID before the crew leaves site.

Two crew members closing out work at a cable reel trailer.

05

DOCUMENT & CLOSE OUT

A dedicated QC specialist reviews the completion package before submission — as-builts, test results, photos and ticket closures. What is reported is what happened on site, including when it went wrong.

0105

THE RECORD,YEAR BY YEAR

Seven years of completions, published in full. Not a selected highlight — the whole table, so it survives a bid review.

Seven-year total 260,620 m

SKATEL Communications completion figures by year, 2019 to 2025, with seven-year totals.
YearRod & rope (m)Cable placed (m)Splice locationsLocate ticketsDirectional drilling (m)BDO collections
20194,8206,8005820,000Not run this year3,658
20206,80011,00010432,000Not run this year9,479
202168,00018,00036246,0002,0008,460
202275,00038,00057834,0006,0003,860
202345,00042,00044326,0007,600Not run this year
202425,00063,00064818,00011,000Not run this year
202536,00058,00069016,00018,0003,800
Total260,620236,8002,883192,00044,60029,257

Figures as reported in the SKATEL Communications Business Portfolio, 2025. A dash means the discipline was not run that year: directional drilling began in 2021, and BDO collection ran under the Telecon and CTI contracts.

CREWS ANDEQUIPMENT

Around thirty vehicles and equipment units, and the crews certified to run them. Counted here in full, so you can check the list against your own scope.

  • 4 splicers

    A splicer working a fibre tray inside a splicing van.

    Splicing

    Fibre and copper across MXU, residential and commercial, with testing and documentation on every location.

    • 4 fully equipped splicing trucks
    • 5 ribbon fusion splicers
    • 2 OTDR units
    • OPM and OLT test meters
  • 6 technicians

    Technicians roping duct from an open roadside vault.

    Rod & rope

    Confined-space certified crew proving and roping duct for mainline and drop builds.

    • Confined-space certification, all techs
    • Full field support kit
    • Duct verification equipment
    • Atlas 185 CFM compressor
  • 5 technicians

    A locate technician sweeping a boulevard with a locator wand.

    Utility locating

    Dedicated locating team serving Edmonton and surrounding areas, supporting ELC operations.

    • Dedicated locate vehicles
    • 192,000 tickets cleared
    • Edmonton and surrounding areas
    • ELC operations support
  • In-house + partners

    A directional drill rig on a rural right-of-way.

    Directional drilling

    In-house crew for drops and mainline, backed by qualified partners across Alberta and British Columbia.

    • 2 Vermeer 6x6
    • 1 Vermeer 10x15
    • 1 tandem hydrovac
    • Compact excavator and skid-steer
  • Aerial & buried

    An aerial lift crew lashing cable to a utility pole.

    Cable placement

    Fibre, copper, coaxial and CAT5 placement, including aerial lashing and residential drops.

    • Fibre-optic cable tuggers
    • Cable blowers
    • Cable reel trailer
    • 32 ft bucket truck
  • In-house

    A civil crew setting a concrete vault beside an excavator.

    Civil

    Tie-ins, vault installations and pedestal placements, sequenced directly with the drilling crew.

    • Compact excavator
    • Skid-steer
    • Vault and PED equipment
    • Flatbed and gooseneck trailers

Vehicles and equipment

A SKATEL-liveried high-roof cargo van in the Acheson shop, the rest of the telecom fleet parked behind it.

Telecom

  • 4Splicing trucks
  • 1Bucket truck, 32 ft capacity
  • 2High-roof cargo vans
  • 2Caravan service vans

9 units

Splice and aerial
A yellow GMC four-by-four pickup parked beside a ladder-racked SKATEL van inside the shop.

Vehicles

  • 5Pickup trucks
  • 2Flat-bed trucks
  • 2SUVs
  • 1550 picker with 5th wheel

10 units

Crew and load
A drilling rig set up on a right-of-way, two crew in high-visibility gear working the bore.

Drilling & civil

  • 2Vermeer 6x6 drilling units
  • 1Vermeer 10x15 drilling unit
  • 1Tandem hydrovac
  • 1Compact excavator
  • 1Skid-steer
  • 1Atlas 185 CFM compressor

7 units

Bore and tie-in
The cable reel trailer in the shop, standing beside racked rod-and-rope reels.

Trailers

  • 1Cable reel trailer
  • 1Cargo trailer
  • 1Gooseneck trailer
  • 1Flatbed trailer

4 units

Reel and haul

30 units across 4 groups, owned and operated out of Acheson.

Delivered for

  • Telus

    I&R, drops and mainline

  • Rogers

    Installation and repair

  • Shaw

    Installation and repair

  • Telecon / CTI

    BDO collection, 85–90% signing rate

  • ELC

    Utility locating operations

A gravel road running past a line of utility poles under an Alberta sunset.

Edmonton and surrounding areas, out of a yard in Acheson. Larger drilling projects are supported across Alberta and British Columbia through established partner contractors.

#120F, 10466 Fulton Dr, Acheson, AB T7X 6A1

  • Edmonton metro
  • Acheson & Parkland County
  • Sherwood Park & Strathcona County
  • St. Albert & Sturgeon County
  • Leduc & Nisku
  • Spruce Grove & Stony Plain

START ACONVERSATION

Tell us the scope and the date it has to be live. We will come back with crew availability and a number, not a brochure.

Enquiries go to Prabakaran Arumugam, who stays on the project through to close-out.

Goes to Prabakaran Arumugam, who prices it against real crew availability.